SAR LMS GWR

SAR LMS GWR
SAR "Commercial Street" - LMS "Wellingford & Bakewell Bridge Railway" - GWR "Porthminster" - Port Dock Station

Wednesday, 30 January 2013

GWR Diag. V5 Passenger Brake Van

Not one to pass up a challenge, I saw the potential in making up two different types of passenger stock from a pair of old Triang Clerestory Brake Thirds. Studying the drawings and photos in well known Great Western coaching stock publications revealed the two compartment sections joined together would produce Diagram C23 10 compartment coach. Then trimming one ducket section off the remaining two brake end sections and joining them together would produce a diagram V5 Passenger Brake Van. Upon making the cuts in the right places and joining them together, both vehicles were accurate for length and looked very much like the prototype photos.
The two vehicles cut and joined together V5 front and C23 to the rear,
undercoated. Internal partition roof supports were added to help hold and
secure the new roof to made. 

The V5 PBV roof line was ever so slightly lower than what it should be but I would be happy with that as it's not obvious. The chassis gear would need the four white metal axlebox/springs, two brass etched W iron sets and two Maunsel style axles to ride on. The long tank, vacuum cylinder, brake shoes , hangers, rodding, and side boards were scratch-built from styrene and spring steel wire. The side boards were secured using staple gun staples which are quite effective given they have a rectangle cross section. Kadee couplers were secured in place with screws and some weight added under the floor.
V5 PBV with cream air brushed on ready for masking for the chocolate brown.
 The vehicle would have the 1928 to 1934 livery so masking for the chocolate had to be carefully done to be faithful to the scheme. Once the brown was dry it was masked up for grimy black to the side sills and chassis including the buffers and beams. 
Roof supports added. roof made up, transfers added, windows
picked out in "Mahogany"

A roof was made from 30thou styrene, bent and formed in the right places. I glued in a couple of lengths of code 100 rail upside down along the curve line inside the roof. This would aid in holding the roof to shape and not warp over time. The roof was glued on and painted, along with the last single gold line separating the cream from the chocolate. This was done with a bow pen.

Roof added with rain strips, lamp housings, end handrails and some weathering to finish.
The final result is convincing and I look forward to towing the V5 behind the 517 class sometime soon.

Tuesday, 15 January 2013

GWR 14XX to 517 Class conversion


I am trying to keep reasonably authentic motive power and rolling stock around the St. Ives, St. Erth, Truro to Penzance area in the late 1920s and early 1930s. Upon researching this era, I discovered there were two 517 class engines brought in as temporary replacements for the 44XX and 45XX engines when they were recalled for overhaul in this time period. That was all I needed for an excuse to have one of these interesting little engines. A Chinese made Hornby 14XX was acquired and the following is a summary of the changes I needed to accomplish a close enough model that would look right at home on the branch and catch the eye of a Great Western enthusiast.

The 14XX out of the box.
The 14XX as it was out of the box was a reasonable runner but it had that annoying limp that so many modellers complain about. Something was going to have to be done about that later! After removing the body the cab roof was able to be prised off as it was a separate piece and the smokebox/boiler assembly could also be detached. On examining the drawings for both 14XX and the two versions of 517class, the easiest option was to convert to the Swindon rebuilt engines which keep the trailing wheel with the outside axle boxes, and most of which had the large style bunker. Also I found that a number of the 517 class had numbers in the low 1400s in my era, and as it happens 1427, which is the number of this particular Hornby model, was a Swindon shed engine. It may have well been one that was temporarily sent to Cornwall!

Using drawings and photos from an article and some internet research, a list of initial expected modifications was made.
  • ·         Remove the sandboxes over the front driving axle
  • ·         Cut off the cab level with tops of the side tanks
  • ·         Cut out 4mm of tank length (see photo, if you cut front of the number plate you can preserve it)
  • ·         Cut out 1.5mm of smokebox length in front of the funnel (the funnel should be in the centre of the smokebox after re-joining but the handrail disguises this somewhat)
  • ·         Cut out about 2mm of footplate in front of the smokebox, there is a join in the plate so cut forward of that so you can use that as a legitimate joint in the plate work
  • ·         Remove the funnel and whistles and keep
  • ·         Remove the top feed cover behind the funnel and its associated piping
Smokebox front and door cut off, top feed removed and piping.
To preserve the number plate the tanks were sliced right on the
row of rivets next to the number plate, then 4mm taken out .
At this stage the body parts were then superglued together and the following parts made up.
  • ·         Extend footplate thickness by 1mm using 40thou square strip
  • ·         Make a new cab using 20thou plasticard, trim the original roof and install the handrails along either side of the top of the roof, and install the whistles as per your photos, some were in front and others on top, also I drilled out the sliding hatch and glued on a sliding plate
  • ·         Make up 4 steps and a pair of boxes on the side tanks
  • ·         Add sanding boxes on the front and also a curved cover plate over the front cylinders under the smokebox. I used some 5thou brass shim, and glue the funnel in its socket
  • ·         Face the front splashers with 10thou plasticard and detail with ribbing as per photos
  • ·         Add all lamp irons and 3 fire iron hooks (not 4 like many of the larger tank engines) on the bunker
  • ·         Cut in a concave radius to the front of the bunker at the top, add coping trim to match the existing trim on the side tanks and the bunker
  • ·         Reinstall the handrails around the boiler and slice off all the moulded handrails everywhere else and replace with 15thou spring steel wire or stanchions where appropriate
  • ·         Cut off the original washout/inspection plugs (2 off) either side of the safety valve jacket and put in 4 new ones of the exposed type
  • ·         Add vacuum pipes front to back along the sides of the footplate – note the left side was smaller diameter than the right side in most cases of the prototype
  • ·         There is a pipe that is seen between the rear driver and the trailing wheel on each side of the firebox
The body glued back together, smokebox front re-attached and
cab construction.
I think that covers most of the changes. Obviously the front of the bunker needs be built up suitably incorporating the back cab plate. Also I built a small backhead to the boiler in the cab that reaches down to the top of the motor. On this I added some valves, a sight glass, a couple of pipes and a regulator. I even put two pressure gauges on the front cab plate but these can’t be seen very well once you put in your engine crew, so it’s not really necessary. The smokebox door has the latch handles moulded straight back to the face of the door which looks ugly. So some careful carving with a sharp pointed knife cut away the web behind the handle that is on an angle vastly  improving the appearance. The study of photos for the finer points of detail will show there were quite a few minor differences among the class. So if you pick a particular style, either the Wolverhampton or Swindon rebuilds or if you go back to an earlier era, be aware of the differences.
All the changes and modifications done to the
body, chassis shortened and couplers trial fitted.

PAINTING THE BODY

The buffers and beam faces were masked off, as was the safety valve cover and the two number plates on the side tanks. A grey primer was applied over all, but a little extra was applied to the re-joined areas to ensure they are not seen through the following green coat. It was let dry for a day then the green was sprayed to the required areas. Removal of the masking tape left only areas of black left to pick out with a brush.

The undercoat.
The green added and chassis before re-wheeling.
Required areas picked out in black and the chassis with
new drivers and machined flanges.
Some HMRS transfers for the GREAT WESTERN were applied to the tanks (no need to bother with the buffer beam numbers as they were untouched) and the whole body given a coat of clear to seal up.
It was time to dress up this little tank;

  • ·         Real coal glued over the fake coal in the bunker
  • ·         Springside lamps attached – in this case one in the upper centre position for branch passenger working and a spare lamp attached on the left side footplate
  • ·         Engine driver and fireman
  • ·         Firing irons and a fire bucket hung on the hooks at the rear of the bunker
  • ·         Vacuum pipes fixed to the buffer beams


IMPROVING THE CHASSIS
The chassis was always going to be cause for concern. I was looking at keeping the chassis as it was but many attempts at fixing that limp ended in defeat. So the Hornby driving wheels were removed (one wheel was out of round and another had the wobbles) and replaced with some Romford wheels that I had lying in a project box from the 1980s.  I machine the flanges down to a RP25 profile (as they had the older flange size) and installed using the Hornby connecting rods and crank pins. The limp was still there so I then had to open out of the journals slightly and pack them with a thin sleeve of brass to remove the axle slop. That did the trick; it then ran quite smoothly which left only the trailing wheel to deal with. The large looking flanges stuck out like a sore thumb, so I machined the flanges down to match the drivers. There is a riveted balance weight on the rear driving wheel, so I used some 3Thou styrene with the rivets produced by poking a sharp compass point through from the other side.
Shortening the body meant also shortening the chassis to fit, so each end had some cut off so the chassis sat neatly inside the buffer beams each end.

At the rear end showing the parts cut off the die-cast,  the motor
plate and the plastic rigging leaving the guard irons.
The Hornby chassis has a plastic keeper assembly which incorporates the pick-ups, but these were not affected.  A consequence of trimming off the chassis meant there was a gap created between the die-cast chassis and the plastic keeper.  This gap just so happens to be the right amount for the NEM Kadee shank to be slotted in, and a small screw threaded in place to hold them. I use Kadees for all my models. The body only appears to need the funnel fixing screw to hold the body to the chassis firmly. All the wheels, chassis ends and copper wire down the side of the firebox were brush painted black. There was a little overspray at the base of the safety valve cover so that was cleaned off and some copper paint was applied to the lower half of the funnel coppertop.

The rear showing firing irons on the hooks and a fire bucket for something
different I noticed on one photo of the prototype
 All that was left now was weathering and glazing the spectacle plates.


This little model took more time to modify than I thought but I think it was worth it, bless its little soul!

Sunday, 30 December 2012

GWR - PORTHMINSTER

My next exhibition project will be a Great Western Railway layout set in the late 1920s to very early 1930s. My main interest in British railways is the LMS, but last year an opportunity arose to acquire a HO/OO scale model of one of Brunel’s Cornish Viaducts. The owner had built it back in the 1960s I believe, and had incorporated it into a South Australian Railways layout that I had the good fortune to operate on a regular basis back in the 1980s. This very nice layout known as the Moping Branch Railway had been disassembled for sale and the last piece that nobody wanted was the viaduct that measured 4.5 metres no less. It had been built in position in one piece so getting it home provided a challenge. After gingerly cutting it into three pieces to transport the model home I immediately thought about how I would use it. Not knowing much about the GWR I plunged into researching how I could use this viaduct to affect a suitable exhibition style layout that would make the viaduct’s builder proud of its new home. Brunel’s viaducts were a common sight in Cornwall UK, to the extent that were 51 of them built to differing styles that were classed into eight designs. Classes A1, A2, B, C, D, E, Y and Z were built and I matched the model to that of class B timber construction on masonry piers. The following layout design was drawn out to incorporate the viaduct, and a suitable main line with branch scheme utilizing the viaduct was settled. The name Porthminster was chosen for it is the name of the beach below St Ives station in Cornwall, and Penwith chosen as it is the shire in which junction station of St. Erth is situated for the St. Ives branch. St Erth is situated on the Main Line for London to Penzance.

The Branch terminus takes its cues from the St. Ives branch and the mainline station has a mix of Radley and Ledbury stations mixed together. Some baseboard construction is under way but the first items completed for the layout have been the signals. Much research on the GWR signalling style was undertaken and as a result a great variety of signals were put together using Ratio kits, providing the building blocks for the individual signals required for each position on the railway. Here are a few photos of some of the more interesting types I put together. To the left is the junction signal that will be used at the end of the main platform in Penwith for the Branch. To the right is the route signal situated on the branch near the first points as you come into the Bay roads from Porthminster at Penwith. The left doll is the Home and Distant for the next signal at the junction, for the main line or loop, centre doll for the Bay road, and right doll for the sidings.
The signal below left will be situated at the end of the platform at Penwith in front of the scissors crossover you see on the plan above. The two left dolls for the loop track and the two right dolls for the main line. Because there is access to either track from either the main or the loop, there are backing signals for each track which are the small lower red and white striped arms. I intend to have passenger trains backing into the loop to drop off coaches for the Branch, so signalling needs to allow this operation. The signals below right are shunting signals for either side of the double slip in Porthminster station yard. The "S" was made from wire and glued on to the arms after painting giving them a nice fine look. In all there are at least sixteen signals required so all have been made up in readiness for their installation.

Wednesday, 12 December 2012

South Australian Railway modelling

To come are progress and projects under way from my workbench. Railway subjects covered will be my interest in modelling South Australian Railways broad gauge and narrow gauge and British railway outline in the London Midland & Scottish and Great Western Railway.