SAR LMS GWR

SAR LMS GWR
SAR "Commercial Street" - LMS "Wellingford & Bakewell Bridge Railway" - GWR "Porthminster" - Port Dock Station

Friday, 6 November 2015

Running Shed water crane...

The water crane, another one that was not so common. Some stages of construction. Copper wire, timber platform deck, plastic sleeve and black heat shrink. An etched brass wheel and solder. 
The basic mast with support bracket at the top

The black sleeve is peice
of heatshrink, The support rails
on the left is code 70 rail









A combination of materials allows this complicated little crane to be made. The timber platform was added during assembly and Supa-glued to the copper wire frames.
Ready for painting. 
Showing the copper wire used
extensively  on this piece.
Paper to a glued to a piece of wire.
Cover the paper with PVA glue
and roll up.  Then bent to shape and
added to the crane after painting.
Completed water crane....with the hose
flopped over the top during non-use.

No comments:

Post a Comment